We have offices and technical centers in Scotland, Houston and Singapore, with the Atec Training Academy having a mobile and fixed solutions for competency training and Assessment in Houston, Mumbai, Singapore, Abu Dhabi and Thailand.
ATEC is dedicated to the safety of personnel, asset, and environmental protection, by supplying a range of lifecycle turnkey compliance and verification services.
Please answer the following questions
Please insert your details to view this content.
A dossier is a must-have for hazardous areas, as it can be used as a compliance trail because it provides proof that equipment used in potentially explosive atmospheres is fully compliant and documented.
Without a comprehensive dossier, there could be no evidence to prove all equipment being used is properly specified and that it has been installed according to relevant standards and then inspected for compliance.
ATEC Inspection Teams collate all the required supporting documents, they make sure there is a master “clean” EX register, certificates for all equipment installed, area classification drawings, Electrical & Intrinsically safe design parameters, manufacturers supporting information.
Do you recognize the need for explosion protection?
Find out more about this service that ATEC offers here www.atec.global/dossier
✅ATEC The go-to company for hazardous area compliance around the world! 🌍
Do you recognize the need for explosion protection?
Step number 1 to a compliant EX Life Cycle for Hazardous Areas is Training.
ATEC provides training to ensure staff understands what Standards, Regulations, Directives & Codes are needed to ensure safety during operations in potentially explosive atmospheres. From beginner to advanced practitioners, ATEC has options for those who could be defined as operatives, designers, or responsible persons.
ATEC regularly carries out training needs analysis for their corporate clients, creating competency matrices to allow teams to understand their specific duties and how these fit into safe operations.
ATEC understands that learning styles can be different, so we offer a variety of course delivery options, in person and online. The ATEC E-Learning platform is self-led, allowing individuals to progress at their own pace to fit their personal schedule.
ATEC can advise students on this first step of their EX Journey, visit our CompEx Course Selector or email us at traning@atec.global
Step 3 to a compliant EX Life Cycle for Hazardous Areas is Design and Unit Verification with the purpose of ensuring that equipment to be installed in potentially explosive atmospheres is documented as safe & suitably certified for its area of use.
ATEC has certified, competent, experienced engineers who can analyze a design against the risk presented in a specified hazardous area and ensure all essential health and safety requirements are met and adequate certification is in place.
This helps our clients ensuring projects can confidently proceed to their purchasing phase.
Find out more about this service here!!
✅ATEC
The go-to company for hazardous area compliance around the world! 🌍
Initial inspection validates that equipment meets Hazardous Area requirements and is correctly installed – Following this, periodic inspection is implemented to look for any damage, deterioration or unauthorised modifications
IEC60079-14.4.3 describes Initial inspection requirements to ensure equipment is installed in accordance with its documentation & that any replaceable items are of the correct type and rating. On completion of the erection and prior to first use, initial detailed inspection of the equipment and installation shall be carried out in accordance with Annex C, which is based on the “detailed” grade of inspection in IEC 60079-17.
The Basic Principles described in IEC 60079-17 4.3.1.1 are that before plant or equipment is brought into service, it shall be given an initial inspection. As part of the plant commissioning and start up procedures, initial inspection and other additional requirements are provided in IEC 60079-14.
To ensure that the installations are maintained in a satisfactory condition for continued use within a hazardous area, either
The Competencies described in IEC 60079-17 4.4.1 Personnel, state;
Regular periodic inspection requires personnel who are competent for the inspection required, including that they:
By analysing then classifying the environment to facilitate the prior selection of electrical (and in some case non-electrical) equipment, you will control the risk associated with equipment installation.
Area classification may be carried out by direct analogy with typical installations described in established codes, or by more quantitative methods that require a more detailed knowledge of the plant. The starting point is to identify sources of release of flammable gas or vapour. These may arise from constant activities; from time to time in normal operation; or as the result of some unplanned event. In addition, inside process equipment may be a hazardous area, if both gas/vapour and air are present, though there is no actual release.
Catastrophic failures, such as vessel or line rupture are not considered by an area classification study. A hazard identification process such as a Preliminary Hazard Analysis (PHA) or a Hazard and Operability Study (HAZOP) should consider these abnormal events.
The most commonly used standard for determining area extent and classification is IEC 60079 part 10.1, which has broad applicability. The current version makes clear the direct link between the amounts of flammable vapour that may be released, the ventilation at that location, and the zone number. It contains a simplistic calculation relating the size of zone to a rate of release of gas or vapour, but it is not helpful for liquid releases, where the rate of vaporisation controls the size of the hazardous area.
Other sources of advice, which describe more sophisticated approaches, are the Institute of Petroleum Model Code of Practice (Area Classification Code for Petroleum Installations), and the Institution of Gas Engineers Safety Recommendations SR25. The IP code is often for use by refinery and petrochemical type operations. The IGE code addresses specifically transmission, distribution and storage facilities for natural gas, rather than gas utilisation plant, but some of the information will be relevant to larger scale user.
To ensure safety within potentially explosive atmospheres equipment must be installed by competent experienced personnel in line with the relevant standards, directives, and codes.
Installers should as well as being certified – fully understand the principles of explosion protection so they can be sure the equipment being installed is acceptable for the actual area of installation.
ATEC staff have these competencies as well as extensive knowledge of international standards, directives, and codes.
Do you recognize the need for explosion protection?
Find out more about this service that ATEC offers here
✅ATEC
The go-to company for hazardous area compliance around the world! 🌍
We are pleased to officially announce the merger of EUTEX International and ATEC. Effective February 14th, 2022, both companies will operate as EUTEX International. This merger makes EUTEX the leading electrical supplier of hazardous area products and services around the globe.
The merger comes as a conjoint effort to offer the worldwide energy and renewable industry an integrated and boundary-pushing approach to working safely in hazardous areas. Our team acknowledges that our products and services impact other people’s lives, so minimizing safety risks for personnel and assets has always been our highest priority.